Renaissance Firstface Technology Place Blog
Infrastructure Update

1000 KVA Power Connected: A Stronger Foundation for Enterprise Operations in Mysuru

Renaissance Firstface Technology Place has achieved a significant infrastructure milestone with 1000 KVA of connected power at its Mysuru campus.

Renaissance Firstface Technology Place office campus in Mysuru

For technology-led businesses, dependable power infrastructure is part of the operational foundation. It supports workstations, cooling systems, network equipment, security systems and the specialised loads required by data-intensive teams. The connection of 1000 KVA of power at Renaissance Firstface Technology Place gives prospective occupiers a clear, measurable specification to consider while planning their Mysuru operations.

What does 1000 KVA of connected power mean?

KVA, or kilovolt-amperes, is a measure used to describe apparent electrical power capacity. In commercial property planning, connected capacity helps engineering and facilities teams assess whether a campus can support the combined demands of office systems and business-critical equipment.

The final usable allocation for an individual occupier will depend on its leased area, equipment plan, fit-out design and agreed technical requirements. Starting with substantial connected capacity, however, enables more informed planning than relying only on future provisioning.

Why power readiness matters to enterprise occupiers

A well-planned office move depends on more than floor area. Power availability affects electrical design, cooling strategy, equipment selection, redundancy planning and the time needed to prepare a workspace for operations. Confirmed connected power helps occupiers and their consultants evaluate these requirements earlier in the decision process.

  • Clearer technical due diligence: facilities teams can assess a defined campus-level capacity during site evaluation.
  • More confident fit-out planning: electrical and mechanical designs can be developed around a known infrastructure baseline.
  • Support for technology-intensive use: the campus is intended for IT, ITeS, R&D and data-led operations that may require higher infrastructure readiness.
  • Room to plan for growth: occupiers can discuss present and future loads as part of their leasing and technical assessment.

Part of a broader enterprise-ready campus

Connected power is one component of the infrastructure at Renaissance Firstface Technology Place. Block A is ready for fit-outs and provides approximately 1.2 lakh sq ft of leasable IT space, with typical floor plates of approximately 22,000 sq ft. The building has also been planned for higher floor loads, supporting the evaluation of data-centre and infrastructure-heavy requirements.

The campus offers 70+ basement parking spaces and 48+ surface parking spaces, with a wider development plan that can scale to approximately 3 lakh sq ft. Together, these specifications give enterprises a practical framework for assessing space, access, infrastructure and future growth in one location.

A practical milestone for office space in Mysuru

Enterprises considering Mysuru increasingly need buildings that can be evaluated against concrete operational requirements. The 1000 KVA connected-power milestone strengthens the readiness of Renaissance Firstface Technology Place and gives decision-makers another verified input for technical and commercial due diligence.

Businesses should confirm their specific power allocation, redundancy, backup and fit-out requirements with the project team before finalising a lease. This ensures that the workspace plan reflects the actual equipment load and operating model.